How Long Building a Website Takes: Timelines by Type and What They Depend On
How long a website takes: landing page from 5 days, business site and store from 14 days. Stages, timeline factors and how to launch faster.
How long building a website takes: the short answer
A landing page (one page) can be done in 5 days or more, a business card site or multi-page website in 14 days or more, and an online store in 14 days or more, depending on the number of products. These are guidelines for work on a builder like Weblium. Custom development from scratch usually takes longer. But the main thing: most often the timeline depends not on the developer but on how quickly the client provides text and photos and approves edits.
If you’re still deciding which format you need, first read what to choose: a landing page or a full website.
Approximate timelines by site type
- Landing page (one page): from 5 days. One offer screen, benefits, reviews, an inquiry form. More about cost and contents in the article “How much a landing page costs”.
- Business card site: from 14 days. Several pages: home, services, about the company, contacts. I wrote about who it suits in the article “What a business card site is”.
- Corporate or multi-page website: from 14 days. The more pages, services and sections, the more time for structure, text and checking.
- Online store: from 14 days. The timeline depends heavily on the number of products, categories, payment and shipping methods and whether the product cards are ready. What to prepare in advance is in the checklist “What you need to open an online store”.
These are work timelines with quick communication. If materials arrive late, the project stretches, and that’s normal: a site can’t be launched without text and photos.
The stages of building a website
- Brief and agreements. You describe the task, and we agree the scope, price and timeline. How to prepare this stage correctly is described in the article “A website brief”.
- Structure and prototype. Which blocks and pages the site will have and in what order.
- Materials. Text, photos, a logo, contacts, reviews. This is most often the longest stage.
- Design and layout. The first version of the site is assembled on a builder or in code.
- Edits. You look at the first version and send comments. Usually one or two rounds.
- Setup. Inquiry forms, analytics, basic SEO, speed, the mobile version.
- Launch. Connecting the domain, checking, publishing and handing over access.
What the timeline depends on
- Readiness of materials. If text and photos already exist, the site is built many times faster. If they need to be written and photographed from scratch, it adds separate days or weeks.
- Speed of approvals. A day’s delay in replying shifts the whole schedule by a day. Appoint one person who makes decisions.
- Number of pages and blocks. One page and 10 pages are different amounts of work at every stage.
- Complexity of functionality. A calculator, a user account, CRM integration and multilingual support are separate tasks.
- Platform. A builder gives a faster start, and custom development more flexibility but a longer road. A platform comparison is in the article “What to build a website on”.
- Number of revisions. If the goal or structure changes after the first version, part of the work has to be repeated.
How to speed up the launch
- Fill in the brief and collect materials before work starts.
- Don’t wait for perfect text: it’s better to launch with good text and add to it later.
- Collect all edits in one list rather than one by one.
- Appoint someone responsible for approvals right away.
- Start with a minimal version (the main pages or one landing page) and leave expansion for later. How to plan the sequence of actions is described in the article “Where to start building a website”.
Is it worth rushing if you need the site “yesterday”
A fast launch is possible if you’re ready to compromise: fewer pages, a simpler structure, ready text. Trying to do everything at once almost always leads to rework. So when time is short, I advise starting with a landing page or a business card site and adding an online store or a large site as a second stage.
Also remember that work doesn’t end at launch: a site needs updates, and search engines need time to index it. So a visible result in search appears later than the site itself.
FAQ
How long does building a website on Weblium take?
A landing page takes from 5 days, a multi-page site or business card site from 14 days. A builder speeds up layout but doesn’t replace the time for text, photos and approvals.
Why does a site take longer than promised?
The most common reasons are delayed materials from the client, new wishes in the middle of the work and a large number of revisions. So it’s better to fix timelines together with a list of what each side must provide.
How long does building an online store take?
From 14 days. The biggest factors are the number of products and how ready the cards are: description, photos, prices. The larger the catalog, the more time it takes to fill.
Can a site be launched faster?
Yes, if you simplify the scope: choose a landing page instead of a multi-page site, prepare materials in advance and approve edits quickly.
When will the site appear on Google?
A site can be published right away, but indexing on Google takes time: from a few days to a few weeks. A request for indexing in Google Search Console helps speed this up.